How Hoverdale reduced clearing up by 75% and save the costs of three members of staff clearing up back spillage & maintaining an inefficient conveyor system
The quarry is one of the largest in Europe and was suffering from excessive carry back spillage which was causing belt damage and using up excessive man hours in clearing up.
Before
To find a way to reinvent carry back spillage and reduce ‘wasted’ man hours and generally improve material flow through the plant.
We started with a site survey to assess the magnitude of the problem followed by a report and recommendations. We offered to demonstrate to effectiveness of our recommendations by selecting the worst transfer point at ground level.
We were given a free hand to do the best job we could.
We installed:
The results were excellent.
A dramatic reduction in spillage and a corresponding reduction in man hours clearing up plus all other associated benefits – less belt damage, less blockades.
We completed our demonstration transfer point in three weeks. After a further four weeks the improvements were so dramatic that we were given the go ahead to upgrade the complete plant.
After the upgrade we only had to visit the site four times a year to carry our minor adjustments. After 18 months we started to replace the scraper blades.
After
The first demonstration units were installed in three weeks. The balance of 38 conveyors were fitted out over a three month period working to a programme in conjunction with our customer.