Worn lagging = lost efficiency.
We replaced rubber-lagged head drums to restore traction, improve tracking, and reduce slippage — ensuring the conveyor runs as it should.
Right-first time. Minimal downtime.

Matt Monday
Engineering is changing quickly, and the companies that stay ahead are the ones willing to adopt new tools.
At Hoverdale we’re now using high-accuracy site laser scanning combined with CATIA engineering software to reverse engineer plant equipment and design new components with exceptional precision.
This approach allows our engineers to capture the exact geometry of an operating plant, build a full 3D model, and move directly from design into manufacture.
The result is simple:
- More accurate designs
• Faster project delivery
• Less site disruption
• Components that fit right first time
For operators, that means less downtime, fewer site visits and significantly lower overall maintenance costs.
Technology like this isn’t about making engineering look impressive on paper.
It’s about solving real problems in the field and delivering measurable results for customers.
That’s where good engineering makes the difference.
#Engineering #BulkHandling #Conveyors #Manufacturing #MaterialsHandling




